Question: A customer estimates that he is getting 30 cubic yards (loose) of gypsum in his scraper. Determine the percent overload if the load estimate is

A customer estimates that he is getting 30 cubic yards (loose) of gypsum in his scraper. Determine the percent overload if the load estimate is correct. The maximum load capacity of the scraper is 84,000 pounds.

Step by Step Solution

3.45 Rating (152 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To determine the percent overload we first need to calculate the weight of the estimated 30 cubic ... View full answer