A newly designed dam is to be modeled in the laboratory. The prime objective of the general
Question:
A newly designed dam is to be modeled in the laboratory. The prime objective of the general model study is to determine the adequacy of the spillway design and to observe the water velocities, elevations, and pressures at critical points of the structure. The reach of the river to be modeled is 1200 m long, the width of the dam (also the maximum width of the reservoir upstream) is to be 300 m, and the maximum flood discharge to be modeled is 5000 m3/s. The maximum laboratory discharge is limited to 0.90 m3/s, and the floor space available for the model construction is 50 m long and 20 m wide. Determine the largest feasible scale ratio (model/prototype) for such a study.
Step by Step Answer:
Engineering Fluid Mechanics
ISBN: 9781118880685
11th Edition
Authors: Donald F. Elger, Barbara A. LeBret, Clayton T. Crowe, John A. Robertson