Question: You are considering two different methods for constructing a new warehouse site. The first method would use prefabricated building segments, would have an initial cost
You are considering two different methods for constructing a new warehouse site. The first method would use prefabricated building segments, would have an initial cost of $6.5 million, would have annual maintenance costs of $150,000, and would last for 25 years. The second alternative would employ a new carbon-fibre panel technology, would have an initial cost of $8.2 million, would have maintenance costs of $650,000 every 10 years, and is expected to last 40 years. Both buildings would be in CCA Class 1 (at a rate of 4 percent) and it is expected that each would have a salvage value equivalent to 25 percent of its construction cost at the end of its useful life. The discount rate the firm uses in evaluating projects is 11 percent. The tax rate is 35 percent. What is the annual cost for each option, and which would you pick?
Step by Step Solution
3.38 Rating (167 Votes )
There are 3 Steps involved in it
Prefab segments Given Initial cost 65M d 4 k 11 T 35 S 25 x 65M 1625000 ... View full answer
Get step-by-step solutions from verified subject matter experts