Question: =+ Determine a sequence based on using (a) the FIFO rule, (b) the due date rule and (c) the shortest operation time rule. Which of

=+

Determine a sequence based on using

(a) the FIFO rule,

(b) the due date rule and

(c) the shortest operation time rule.

Which of these sequences gives the most efficient solution and which gives the least lateness?


Sequence of jobs Process time (days) Due date A 4 12 B 3 5 C 1 7 D 2 9 E 2 15 F 5 8 TABLE 9.3 The six jobs that Mark has to sequence