How many standard hours are needed to run an order of 200 pieces if the setup time
Question:
How many standard hours are needed to run an order of 200 pieces if the setup time is 1.3 hours and the run time 0.3 hours per piece? How many actual hours are needed at the work center if the efficiency is 130% and the utilization is 70%?
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 90% (11 reviews)
Time required 13 03 200 ...View the full answer
Answered By
Rayan Gilbert
I have been teaching since I started my graduation 3 years ago. As a student, working as Teacher/PA has been tough but made me learn the needs for student and how to help them resolve their problems efficiently. I feel good to be able to help out students because I'm passionate about teaching. My motto for teaching is to convey the knowledge I have to students in a way that makes them understand it without breaking a sweat.
5.00+
1+ Reviews
10+ Question Solved
Related Book For
Introduction To Materials Management
ISBN: 978-9386873248
8th edition
Authors: Arnold J. R. Tony, Gatewood Ann K., M. Clive Lloyd N. Chapman Stephen
Question Posted:
Students also viewed these Earth sciences questions
-
How many standard hours are needed to run an order of 500 pieces if the setup time is 2.0 hours and the run time 0.3 hours per piece? How many actual hours are needed at the work center if the...
-
What would be the reduction in manufacturing lead time if the second machine could not be set up until the setup was completed on the first machine? An order for 100 of a product is processed on...
-
An order for 100 of a product is run on work center 40. The setup time is 4 hours, and the run time is 3 minutes per piece. Since the order is a rush and there are two machines in the work center, it...
-
The following atomic absorption results were obtained for determinations of Zn in multivitamin tablets. All absorbance values are corrected for the appropriate reagent blank (c Zn = 0.0 ng/mL). The...
-
a. Propose a mechanism for the formation of the prepolymer formed by bisphenol A and epichlorohydrin. b. Propose a mechanism for the reaction of the prepolymer with the hardener.
-
It takes 2.010 kJ of heat to raise the temperature of 1.000 kg of steam by 1.000C. In a steam generator, a total of y kJ is used to raise the temperature of 50.00 kg of steam from 100C to TC. Express...
-
Fantastic Sams and Defendants PSTEVO, LLC and Jeremy Baker entered into a franchise agreement pursuant to which Fantastic Sams granted PSTEVO a franchise to operate a Fantastic Sams Salon. According...
-
Public Charity. The Kids Club of Clare County is a public charity under IRC Sec. 501 (c) (3). It had total support last year of the following: United Way support $80,000 Grant from dare County 70,000...
-
In June 2022, the Federal Reserved imposed its first 0.75% interest rate hike -- the largest increase since 1994. Starting in January 2023, they dropped back to lower rate increases, but the rate...
-
The production planning period for flat-screen monitors at Louisiana's Roa Electronics. Inc., is 4 months. Cost data are as follows: Regular-time cost per monitor $ 70 Overtime cost per monitor $110...
-
A work center consisting of 3 machines operates 40 hours a week. In a 4-week period, it actually worked 355 hours and produced 475 standard hours of work. Calculate the utilization and efficiency of...
-
You have just graduated from college and are looking to buy your first car. Money is tight right now, so you are concerned with initial cost as well as ongoing expenses. At the same time, you dont...
-
Consider the setting of Problem 9. Suppose that in the event Hema Corp. defaults, $90 million of its value will be lost to bankruptcy costs. Assume there are no other market imperfections. a. What is...
-
LB Corporation purchased a business car in June 2018 for \(\$ 62,000\). The car weighs 4,000 pounds and will be used 100 percent of the time in the business. Compute the largest depreciation...
-
What obstacles stand in the way of the more widespread adoption of worklife balance policies?
-
Analyse the links between intra-organisational factors that impact upon strategic reward management.
-
Explain the factors in the external environment that have led to the increased interest in strategic reward management;
-
The Tibbett and Britten Group (TBG) is a UK-based international logistics service provider. Its main customers are retailers and manufacturers, to whom it provides warehouse, distribution and...
-
In Exercises 6.143-6.160, X denotes a binomial random variable with parameters n and p. For each exercise, indicate which area under the appropriate normal curve would be determined to approximate...
-
Periwinkle Company is a multinational organization. Its Parts Division is located in Lavender Land, while its Assembly Division is located in North Orchid. During the current year Periwinkle Companys...
-
What are manganese nodules? Why have these known deposits not been mines?
-
Have mineral deposits been mined in Antarctica? Why or why not?
-
How does the industrial ecosystem at Kalundborg, Denmark, resemble a natural ecosystem? Would this approach produce more, or fewer, greenhouse gases than if the same energy and products were produced...
-
Examine the importance of cultural diversity in the workplace Cite specific research/evidence on the benefits of cultural diversity for the organization and employees Recommend one solution...
-
The place kicker on a football team kicks a ball from ground level with an initial speed of 8 . 1 0 m / s at an angle of 2 5 . 0 degrees above the horizontal. How long is the ball in the air, in...
-
A particle moves in two dimension with acceleration of 5 m/s directed along the negative direction of the x axis. The particle starts from the origin with an initial velocity of (121 + 6) a. Find the...
Study smarter with the SolutionInn App