Question: Digital Systems allocates manufacturing overhead based on machine hours. Each connector should require ten machine hours. According to the static budget, Digital Systems is expected
Digital Systems allocates manufacturing overhead based on machine hours. Each connector should require ten machine hours. According to the static budget, Digital Systems is expected to incur:

During January, Digital Systems actually used 825 machine hours to make the 75 connectors. Digital Systems’ predetermined standard total manufacturing overhead rate is
a. $5.25 per machine hour
b. $8.00 per machine hour
c. $13.25 per machine hour
d. $16.06 per machine hour
1,000 machine hours per month (100 connectors x 10 machine hours per connector) $5,250 in variable manufacturing overhead costs $8,000 in fixed manufacturing overhead costs