Question: Systems allocates manufacturing overhead based on machine hours. Each connector should require 8 machine hours. According to the static budget, expected to incur the following:
Systems allocates manufacturing overhead based on machine hours. Each connector should require 8 machine hours. According to the static budget, expected to incur the following: During August, actually used 500 machine hours to make 100 connectors and spent 5000 in variable manufacturing costs and 7800 in fixed manufacturing overhead costs. Calculate the variable overhead efficiency variance for . 480 machine hours per month (60 connectors 8 machine hours per connector) $6,000 in variable manufacturing overhead costs $9,560 in fixed manufacturing overhead costs

BackFill Systems allocates manufacturing overhead based on machine hours. Each connector should require 8 machine hours. According to the static budget, BackFill expected to incur the following: (Click the icon to view the static budget information.) During August, BackFill actually used 500 machine hours to make 100 connectors and spent $5,000 in variable manufacturing costs and $7,800 in fixed manufacturing overhead costs. Calculate the variable overhead efficiency variance for BackFill. A. $3,750F B. $1,250U C. $5,000F D. $2,500F More info 480 machine hours per month (60 connectors 8 machine hours per connector $6,000 in variable manufacturing overhead costs $9,560 in fixed manufacturing overhead costs
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
