Question: If A is produced only on Machine M1 and B produced only on machine M2, then what is the unutilised time on M2 in a

If A is produced only on Machine M1 and B produced only on machine M2, then what is the unutilised time on M2 in a day, if A and B are produced in 1:1 ratio?

(a) 20 minutes

(b) 60 minutes

(c) 150 minutes

(d) None of these.