Question: Standard cost is a (a) Predetermined cost (b) Variable cost (c) Fixed cost (d) Profit
Standard cost is a
(a) Predetermined cost
(b) Variable cost
(c) Fixed cost
(d) Profit
Step by Step Solution
3.37 Rating (150 Votes )
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
