Question: 7. For the project shown in the network shown below: a. Find the expected project duration. b. Find the critical path. c. Find the slack
7. For the project shown in the network shown below:
a. Find the expected project duration.
b. Find the critical path.
c. Find the slack at each activity.

8,9 E, 6 A, 5 C, 10 F,6 K, 5 M, 6 G, 6 D, 7 H, 7 7, 10 L, 8
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts