Question: Qeustion 2: For the project shown in the network shown below: a.) Find the expected project duration. b.) Find the critical path. c.) Find the

Qeustion 2: For the project shown in the network

Qeustion 2: For the project shown in the network

Qeustion 2: For the project shown in the network shown below: a.) Find the expected project duration. b.) Find the critical path. c.) Find the slack at each activity. B 9 8 ES FE D 5 LS LF F E 9 a b Critical path= Expected completion date= A slack= slack= slacks slack= slack= F slack= slack= H slack= Ozo