Explain the nature and importance of a work breakdown structure in project management.
Question:
Explain the nature and importance of a work breakdown structure in project management.
Fantastic news! We've Found the answer you've been seeking!
Step by Step Answer:
Answer rating: 100% (QA)
Nature and Importance of a Work Breakdown Structure in Project Management In project management a Work Breakdown Structure WBS is a hierarchical decom...View the full answer
Answered By
Susan Juma
I'm available and reachable 24/7. I have high experience in helping students with their assignments, proposals, and dissertations. Most importantly, I'm a professional accountant and I can handle all kinds of accounting and finance problems.
4.40+
15+ Reviews
45+ Question Solved
Related Book For
Question Posted:
Students also viewed these Business questions
-
Compute P(Gender = Male, Height = Tall, Phone = Android) 2.Compute P(Gender = Female, Phone = iPhone) 3.Compute P(Phone = iPhone | Gender = Male) 4.Compute P(Phone = Android | Gender = Female, Height...
-
Identify the fundamental principles and practices of project management in an organization. Describe the key elements of a project and a role of a project manager. Demonstrate the ability to create...
-
In what ways does project managers develop and implement plans using steps, tools, and techniques to support the process. In what decision Making choices comes down to what will work best for the...
-
An excise tax of $1.00 per gallon of gasoline placed on the suppliers of gasoline would shift the supply curve Multiple Choice O down by $1.00. down by more than $1.00. up by $1.00. up by less than...
-
Refer to the Alpine Botany (Nov. 2012) study of rare plants that grow on the limestone cliffs of the Northern Swiss Jura mountains, Exercise 2.165 (p. 97). Data on altitude above sea level (meters),...
-
Bai Biotech enters into a licensing agreement with Pang Pharmaceutical for a drug under development. Bai will receive a payment of 10,000,000 if the drug receives regulatory approval. Based on prior...
-
How does a data management system differ from a communication system?
-
Clott was chairman and chief executive officer of First American Mortgage Company, Inc. (FAMCO), which originated loans and sold the loans to investors, including E. F. Hutton Mortgage Corp....
-
The balance sheet for Trinity Motors Company for December 3 1 of 2 0 2 2 and 2 0 2 3 . What was the cash flow to stockholders in 2 0 2 3 ?
-
Construct simple network diagrams.
-
Name the six key decisions in project management.
-
In general, how would fair values be determined for liabilities?
-
When heteroscedasticity is detected, we sometimes use a weighted regression in which the dependent and independent variables are weighted by the variances of their error terms. Thus, the estimated...
-
A double-pipe heat exchanger is to be designed to cool 5.5 gal/min of a hot oil from 250F to 120F using 11 gal/min of cooling water available at 70F. The exchanger is to consist of 12-ft-long...
-
Plastic spheres, 0.02 m in diameter and initially at 120C, are cooled by allowing them to drop into a large pool of water at 20C. The spheres have a density of 1050 kg/m 3 , a heat capacity of 900...
-
A cylinder of a radioactive solid, 1.5 cm in radius and 2 m long, is encased in a cylindrical shell of pyrex glass, 3.0 cm in outside radius. The radioactive core generates heat at the steady rate of...
-
Construct a 90 % confidence interval for the parameter estimates from question 40. Assume n = 30. Question 40 Buford Lightfoot, a stock market analyst, is interested in finding a model to describe...
-
Recording Transactions (Including Adjusting and Closing Entries), Preparing a Complete Set of Financial Statements, and Performing Ratio Analysis Josh and Kelly McKay began operations of their...
-
(a) As Section 17.3 discusses, high-frequency sound waves exhibit less diffraction than low-frequency sound waves do. However, even high-frequency sound waves exhibit much more diffraction under...
-
A toy manufacturer distributes its toys from five distribution centres (DCs) throughout the country. Anew plant is to be built for a new line of toys. The monthly quantities to be shipped to each DC'...
-
A clothing manufacturer produces women's clothes at four locations. A coordinate system has been determined for these four locations as shown below'. The location of a central warehouse for rolls of...
-
A company that handles hazardous waste wants to open up a central disposal centre. The objective is to minimize the total shipping cost to tire disposal centre from five receiving stations it...
-
An industrial plant is operating near a local lake. The air discharge from the plant has led to local CO2 levels of 500 ppm. What is the pH of the lake? How would this change if the CO2 levels were...
-
Assume If C and D are Complementary Goods, Rise in Price of Good D will result into what ?
-
Bidding a job is inherently an expensive process, costing company resources in manpower and time. Discuss the risks of bidding construction jobs, including winning them.
Advances In Databases And Information Systems Moscow 1995 1st Edition - ISBN: 3540760148 - Free Book
Study smarter with the SolutionInn App