1. From the following from-to matrix and the layout, calculate the loaddistance score. Next, using logic, propose...

Question:

1.  From the following “from-to” matrix and the layout, calculate the load–distance score. Next, using logic, propose a better layout and calculate the load–distance score of your proposed layout.

FROM A A B CDEF B 0 Adoo E 0 10 35 12 A B C D E F

The current load–distance score is ______________

The proposed load–distance score is _____________

2. I have done the hard part; I have already balanced the production line and come up with the following five workstations. It is a moving assembly line (like auto assembly).

WORKSTATION 1 2 3 4 5 PRODUCTIVE TIME 4 min. 4 min. 3 min. 5 min. 6 min. IDLE TIME 2 min. 2 min. 3 min. 1

A. How long does it take a unit to go from the beginning to the end of the line?

B. In a four-hour period, how many units would be produced on this line? (Assume the line begins and ends with the period full of units.)

C. What is the efficiency of the line?

D. If the layout for this line consisted of three workstations, how would you expect the cycle time, efficiency, and production rate to be affected?  (increase, decrease, remain the same, or it depends)

E. What impact would the breakdown of a workstation have on production?

F. What suggestions do you have for minimizing the effects of machine breakdowns in the future?

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Related Book For  book-img-for-question
Question Posted: