Question: A manufacturing assembly line has a demand for a specific part of 1200 parts per eight-hour day. It wants to design a lean system using

A manufacturing assembly line has a demand for a specific part of 1200 parts per eight-hour day. It wants to design a lean system using containers. It takes about four hours to round-trip a container from one work center to the next and back again. They also want to hold 10 percent safety stock of this part in their system. 

a) Design a container system and state each container’s size and how many are needed.

b) Calculate the maximum system inventory for this part.

Step by Step Solution

3.43 Rating (169 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a D 150hr T 4 hrs S 110 So K 1... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (2 attachments)

PDF file Icon

1454_6054778c4d4b2_667996.pdf

180 KBs PDF File

Word file Icon

1454_6054778c4d4b2_667996.docx

120 KBs Word File

Students Have Also Explored These Related Operations Management Questions!