A manufacturing assembly line has a demand for a specific part of 1200 parts per eight-hour day.

Question:

A manufacturing assembly line has a demand for a specific part of 1200 parts per eight-hour day. It wants to design a lean system using containers. It takes about four hours to round-trip a container from one work center to the next and back again. They also want to hold 10 percent safety stock of this part in their system. 

a) Design a container system and state each container’s size and how many are needed.

b) Calculate the maximum system inventory for this part.

Fantastic news! We've Found the answer you've been seeking!

Step by Step Answer:

Question Posted: