Question: Complete the MRP records for end-product P. Week ProductP Low-Level Code:0 Lead Time: 1 week Lot Size: 2-week fixed-period ordering 3 4. 9. 10 Gross
Week ProductP Low-Level Code:0 Lead Time: 1 week Lot Size: 2-week fixed-period ordering 3 4. 9. 10 Gross Requirements Scheduled Requirements Projected On-Hand Inventory = 200 Planned Order Receipts Planned Order Releases. 60 60 90 130 65 75 100 40 85 55