Question: I need help with the net requirements. I dont know what to do. I still dont get thr whole process. Thank you Bill of Material

I need help with the net requirements. I dont know what to do. I still dont get thr whole process. Thank you I need help with the net requirements. I dont
I need help with the net requirements. I dont
Bill of Material for Office Table Table Final Assembly Top Assembly (1 required) Support Assembly (1 required) Bracket (6 required) Wood Screw (48 required) Center Support (1 required) Side Support (2 required) MS.53 An office furniture manufacturer needs to calculate material requirements for one of its most popular tables. The graphic ab material for this item. Below are the MRP tables for the top level assembly (the Office Table Final Assembly) and one of its sub-ass Assembly): 8/8 8/15 8/29 9/12 8/1 500 8/22 600 9/5 600 9/19 300 9/26 200 200 340 Office Table Final Assembly Gross Requirements Scheduled Receipts Projected On-Hand Inv. Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) Lot Size 75 8/1 B/B 8/15 8/22 8/29 9/5 9/12 9/19 9/26 90 130 Table-Top Assembly Gross Requirements Scheduled Receipts Projected On-Hand Inv. Net Requirements Planned Order Receipts Planned Order Releases Lead Time (In weeks) Lot Size 1 10 For the Office Table above (the first MRP table), what is the Projected On-Hand Inventory in the week of 9/19? 15 For the Office Table above, what are the planned Order Recepts in the week of 8/8? 150 For the Table Top Assembly above, what are the Net Requirements in the week of 9/19? - 150 For the Table Top Assembly above, what are the planned Order Releases in the week of 9/5? 300

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!