Refer to problem 14. Reformulate that transportation problem as a linear programming model. Data from problem 14
Question:
Data from problem 14
Pennington Hardwood Lumber Supplier has three lumber mills in San Jose, Dayton, and Boston that manufacture pre-cut hardwood. These pre-cut hardwood are shipped to building warehouses in Cleveland, Orlando, Denver, San Diego, and New York for further distribution. The following table shows the production capacity in tons of pre-cut hardwood at each mill, the number of tons of hardwood required at each of the building warehouse, and the shipping costs (in $ per ton). Solve this transportation problem to minimize total costs using Excel Solver.