Question: Refer to problem 8. You are the production planner at Dickinson Sports Equipment Inc. The lead times for assembling the skateboard and for assembling or

Refer to problem 8. You are the production planner at Dickinson Sports Equipment Inc. The lead times for assembling the skateboard and for assembling or acquiring the various subassemblies and components are as follows: skateboard (1 week), fiberglass board (2 weeks), wheel assembly (2 weeks), wheel mount stand (3 weeks), wheels (1 week), spindle (3 weeks), and locknut (1 week). Given this information, if an order for the skateboard is to be shipped at the beginning of week 10, what is the latest week by which work on that order has to be started and still be shipped on time?


Data from problem 8

Dickinson Sports Equipment Inc. is a mythical manufacturer of a variety of sports goods. The bill of materials for one of its popular products, a sidewalk skateboard, is made up of a fiberglass board and two wheel assemblies. Each wheel assembly requires two wheels, one spindle, one wheel mount stand, and two locknuts.

Step by Step Solution

3.44 Rating (157 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Shipping in Week 10 requires a fiberglass board and wheel assemblies in Week 9 Having ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operations Management Questions!