Question: The repair manager at Standard Components needs to develop a schedule for repairing eight Dell PCs. Each job requires analysis using the same diagnostic system.

The repair manager at Standard Components needs to develop a schedule for repairing eight Dell PCs. Each job requires analysis using the same diagnostic system. Furthermore, each job will require additional processing after the diagnostic evaluation. The manager does not expect any rescheduling delays, and the jobs are to move directly to the next process after the diagnostic work has been completed. The manager has collected the following processing time and scheduling data for each repair job:

Due Date Shop Time Order Arrived Processing (days from Remaining Operations now) Time Since Time (days) (days) (days) Re

a. Compare the relative performance of the FCFS, SPT, EDD, S/RO, and CR priority rules in terms of the percent of jobs past due, average days past due, and maximum days past due. 

b. Discuss the selection of one of the rules for this company. What criteria do you consider most important in the selection of a rule in this situation?

Due Date Shop Time Order Arrived Processing (days from Remaining Operations now) Time Since Time (days) (days) (days) Remaining Job 2.5 10 1.25 2 2.75 3.5 3 2.50 4.0 3.00 4.5 12 2.50 3.0 4 1.75 2.5 3 2.25 3.0 9. 2.00 2.5 3 CO 4) CO CO

Step by Step Solution

3.47 Rating (167 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Standard Components a Relative performance The following table shows that FCFS and SP... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operations Management Questions!