Question: Find the critical path, total float, and free float for each activity in the project networks FIGURE 44 B3 F4 G5 6 15. A3 C4
Find the critical path, total float, and free float for each activity in the project networks

FIGURE 44 B3 F4 G5 6 15. A3 C4 J4 I 2 5 E3 D3 4 K2 H6 L6 8