The library software application needs to be upgraded. A backlog of requested features has been collected and prioritized in the following backlog. Review this list and with the information provided, draft a Product Roadmap with three releases. Each release should include an extra feature if the team has time (stretch goal). Be sure to consider the dependencies.

Backlog Feature# Feature Priority Dependencies Estimate (est.)

l Map of library High None 1 story points 2 Collect patron profile information Med None 3 story points 3 Allow patron to set up login id and password High 2 5 story points 4 “Resume Builder” High 3 5 story points 5 “Job application cover letter builder” Med 4 3 story points 6 Connect to popular job boards Med None 5 story points each 7 Search by author name Med None 3 story points 8 Search by book title High None 5 story points 9 Search by magazine article title Med None 8 story points 10 Ability to join a book club Med 11 3 story points 11 Ability to add a new book club Med 3 5 story points Product Roadmap Total with Stretch

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related PMP® Exam Practice Test And Study Guide Questions!