Question: A project manager creates a component-specific tool to verify that a set of required steps have been performed. This tool is called a: A. Risk
A project manager creates a component-specific tool to verify that a set of required steps have been performed. This tool is called a:
A. Risk Register B. Assumptions log C. Checklist D. Plan-Do-Act-Check
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts