Question: 2.1. For the block replacement example of this section for which p, = 0.1, P2 = 0.4, p3 = 0.3, and p, = 0.2, suppose
2.1. For the block replacement example of this section for which p, = 0.1, P2 = 0.4, p3 = 0.3, and p, = 0.2, suppose the costs are
c, = 4 and c2 = 5. Determine the minimal cost block period K* and the cost of replacing upon failure alone.