Question: Two engineers are analyzing step-test data from a bioreactor. Engineer A says that the data indicate a second-order over damped process, with time constants of

Two engineers are analyzing step-test data from a bioreactor. Engineer A says that the data indicate a second-order over damped process, with time constants of 2 and 6 min but no time delay. Engineer B insists that the best fit is a FOPTD model, with τ = 7 min and θ = 1 min. Both engineers claim a proportional controller can be set at a large value for Kc to control the process and that stability is no problem. Based on their models, who is right, who is wrong, and why? Use a frequency response argument.

Step by Step Solution

3.36 Rating (159 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

Engineer A is correct Second order ... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Document Format (2 attachments)

PDF file Icon

1602_606321ef19db1_680401.pdf

180 KBs PDF File

Word file Icon

1602_606321ef19db1_680401.docx

120 KBs Word File

Students Have Also Explored These Related Process Dynamics Control Questions!