Question: 2. Using the following table, discuss how the risks were addressed or how they could have been addressed. Include any additional risks you can think

2. Using the following table, discuss how the risks were addressed or how they could have been addressed. Include any additional risks you can think of.

Newtown, South Africa, is a suburb of Johannesburg that boasts a rich cultural heritage. As part of an attempt to help rejuvenate Newtown, the Nelson Mandela Bridge was constructed to link it to important roads and centers of commerce in Johannesburg. Spanning 42 electrified railway lines, the bridge (Figure 11.10) has been acclaimed for its functionality and beauty.
Lack of space for the support pylons (towers) between the railway lines dictated that the bridge design would have a long span. This resulted in a structure with the bridge deck supported by stay cables from pylons of unequal height. The pylons on the northern side are 48 meters high, and those on the southern side are 35 meters high.

Possible Risk Event Failure to make an acceptable profit Not finishing the

Possible Risk Event Failure to make an acceptable profit Not finishing the construction by Nelson Mandela's 85th birthday Interference with rail activities Geological structures necessitating expensive foundations The concrete mixture segregating when pumped into the columns A pump failure while concrete is being pumped Interrupted supply of concrete due to trucks transporting concrete delayed in traffic Plans to Address Risk Accept Avoid Reduce Transfer Contingency (Plans and/ or Reserves)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Project Management Questions!