Question: A project where the scope evolves as the work takes place is called either progressive planning or: A. Synchronous planning B. Continuous planning C. Rolling
A project where the scope evolves as the work takes place is called either progressive planning or:
A. Synchronous planning
B. Continuous planning
C. Rolling wave planning
D. Continuous re estimation planning
Step by Step Solution
3.32 Rating (161 Votes )
There are 3 Steps involved in it
C Ro... View full answer