Question: Use the schematic below to answer these EV questions. Assume the status point is time 15. Calculate the following EV parameters based on this schematic.
Use the schematic below to answer these EV questions. Assume the status point is time 15.
Calculate the following EV parameters based on this schematic.

A. SPI = _______________________________ B. CPI = ________________________________ C. EAC = _______________________________ D. ETC = _______________________________ E. Using the theory of Earned Schedule calculate the schedule status for the project shown above. Show your calculations and explain the result.
ES is ___________________________________
EA 1000 500 400 AC EV 11 12 15 18 Time BAC
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts