Question: How is secondary risk assessed? A. E = (a + 4m + b) / 6 B. EMV plus 10 percent C. Determine probability and multiply

How is secondary risk assessed?

A. E = (a + 4m +

b) / 6 B. EMV plus 10 percent C. Determine probability and multiply by impact D. The same way as original or residual risks