Question: Use the example graphic shown below to answer this question. If the duration of activity B was changed to 10 days and the duration of

Use the example graphic shown below to answer this question. If the duration of activity B was changed to 10 days and the duration of activity G was changed to 9 days, which of the following is the critical path?7 B 5 C 10 A D 14 E 2 8 H

A. A-B-C-E-H B. A-D-E-H C. A-F-G-H D. A-F-G-E-H

7 B 5 C 10 A D 14 E 2 8 H FL F 7 G 6