Question: During project scope planning, the work breakdown structure should be developed to: (a) The sub-project level (b) The level determined by the PMO (c) A
During project scope planning, the work breakdown structure should be developed to:
(a) The sub-project level
(b) The level determined by the PMO
(c) A level allowing for adequate estimates
(d) The cost center level