Question:
Job 007 requires $10,000 of direct materials, $4,000 of direct labor, 400 tons of material, 200 machine hours, two setups, ten inspection hours, and one design change. The manufacturing overhead cost pools and overhead rates in each pool follow:
Cost Pool/Overhead Rate:
Material handling......$20/ton of material
Machine usage.........$40/machine hour
Machine setups........$1,000/setup
Design changes........$2,000/design change
Inspection.................$50/inspection hour
Determine the cost of Job 007. Instructions: