Question: 0 . 5 5 ( 1 ) Use the high - low method to estimate the fixed and variable components of total costs. ( 2
Use the highlow method to estimate the fixed and variable components of total costs.
Estimate total costs if units are produced.
Skipped
HighLow method Calculation of variable cost per unit
Total cost at the high point
Variable costs at the high point
Volume at the high point
Variable cost per unit
Total variable costs at the high point
Total fixed costs
Volume at the low point
Variable cost per unit
Total variable costs at the low point
Total fixed costs
Estimated cost if units are produced:
Estimated total cost
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock