Question: 0 Bathroom Remodel 1 Project Planning 31.1 Develop Project Plan 11.2 Develop Layout 11.3 Determine Materials Needed for Project 12 Procurement 102.1 Purchase Initial Equipment

0 Bathroom Remodel 1 Project Planning 31.1 Develop Project Plan 11.2 Develop Layout 11.3 Determine Materials Needed for Project 12 Procurement 102.1 Purchase Initial Equipment 12.2 Obtain Required Permits 32.3 Secure Contractors 32.4 Purchase new bath/shower fixture 22.5 Purchase new cabinets & Sink 13 Plumbing 63.1 Remove or reroute existing plumbing 23.2 Add additional plumbing 33.3 Install new fixtures 14 Electrical 64.1 Inspect current wiring 14.2 Rewire for new fixtures 24.3 Install new lighting and outlets 35 Flooring 75.1 Remove existing flooring 15.2 Install subfloor 25.3 Install new waterproof flooring 46 Walls 56.1 Remove paint from existing 26.2 Prepare wall for new bath fixtures 16.3 Paint with moisture-proof paint 27 Installation 77.1 Install new shower/bath fixture 37.2 Install New Cabinets 27.3 Install new sink 28 Project Completion 58.1 Inspect all plumbing 18.2 Inspect all electrical wiring 28.3 Test all new fixtures 18.4 Final walkthrough for approval 1 Total Days to Complete 49What is the critical path?

0 Bathroom Remodel 1 Project Planning 31.1
0 Bathroom Remodel 1 Project Planning 3 1.1 Develop Project Plan 1 1.2 Develop Layout 1 1.3 Determine Materials Needed for Project 1 2 Procurement 10 2.1 Purchase Initial Equipment 2.2 Obtain Required Permits 2.3 Secure Contractors 2.4 Purchase new bath/shower fixture 2.3 Purchase new cahinets & Sink 3 Plumbing 6 3.1 Remove or reroute existing plumbing 3.2 Add additional plumbing 3.3 Install new fixtures 1 4 Electrical 6 4.1 Inspect current wiring 1 4.2 Rewire for new fixtures 4.3 Install new lighting and outlets 3 5 Flooring 7 2.1 Remove existing flooring 1 2.2 Install subfloor 2.3 Install new waterproof flooring 4 6 Walls 5 6.1 Remove paint from existing = R g Ll = e ka 6.2 Prepare wall for new bath fixtures 1 6.3 Paint with moisture-proof paint 7 Installation 7 7.1 Install new shower/bath fixture 3 7.2 Install New Cabinets 2 1.3 Install new sink M 8 Project Completion 5 8.1 Inspect all plumbing 8.2 Inspect all electrical wiring 8.3 Testall new fixtures el i N 8.4 Final walkthrough for approval Total Days to Complete 49

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!