Question: 04 (15 pts.): A table is assembled using three components, as shown in the below product structure tree. The company that makes the table wants

04 (15 pts.): A table is assembled using three components, as shown in the below product structure tree. The company that makes the table wants to ship 100 units at the beginning of day 4, 150 units at the beginning of day 5, and 200 units at the beginning of day 7. Receipts of 100 wood sections are scheduled at the beginning of day 2. There are 120 legs on hand. There are 60 braces on hand. Lead times (in days) for all items are shown in the following table. Prepare a material requirements plan using lot-for-lot ordering, Table Quantity Lead time 1-200 1 201-550 2 551-999 3 Wood sections (2) Braces (3) Legs (4)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
