Question: 1 0 . 2 0 . An x chart is used to maintain current control of a process. A single assignable cause of magnitude 2

10.20. An x chart is used to maintain current control of
a process. A single assignable cause of magnitude
2 occurs, and the time that the process remains
in control is an exponential random variable with
mean 100h. Suppose that sampling costs are $0.50
per sample and $0.10 per unit, it costs $5 to investi-
gate a false alarm, $2.50 to find the assignable cause,
and $100 is the penalty cost per hour to operate in
the out-of-control state. The time required to collect
and evaluate a sample is 0.05h, and it takes 2h to
locate the assignable cause. Assume that the process
is allowed to continue operating during searches for
the assignable cause.
a. What is the cost associated with the arbitrary
control chart design n=5,k=3, and h=1?
b. Find the control chart design that minimizes the
cost function given by equation 10.31.
10.21. Consider the cost information given in Exercise
10.20. Suppose that the process model represented
by equation 10.31 is appropriate. It requires 2h to
investigate a false alarm, the profit per hour of oper-
ating in the in-control state is $500, and it costs $25
to eliminate the assignable cause. Evaluate the cost
of the arbitrary control chart design n=5,k=3,
and h=1.
 10.20. An x chart is used to maintain current control of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!