Question: From Introduction to Statistical Quality Control CH 1 0 1 0 . 3 0 . An x chart is used to maintain current control of
From Introduction to Statistical Quality Control CH
An chart is used to maintain current control of a
process. A single assignable cause of magnitude TABLE E
Chemical Product Viscosity
occurs, and the time that the process remains in con
trol is an exponential random variable with mean
h Suppose that sampling costs are $ per
sample and $ per unit, it costs $ to investigate a
false alarm, $ to find the assignable cause, and
$ is the penalty cost per hour to operate in the out
ofcontrol state. The time required to collect and
evaluate a sample is h and it takes h to locate
the assignable cause. Assume that the process is
allowed to continue operating during searches for the
assignable cause.
a What is the cost associated with the arbitrary
control chart design and
b Find the control chart design that minimizes the
cost function given by equation or
where
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
