Question: 1 0 . 2 Examine the network schedule with its activities, their durations, and initial cost plus extra cost for acceleration in the table. Draw
Examine the network schedule with its activities, their durations, and initial
cost plus extra cost for acceleration in the table. Draw its network diagram,
determine the critical path, perform a timecost tradeoff analysis to minimize the
total project duration and accelerated cost, and record your
steps.
Name Initial Accelerated
Activity Successor Time Cost Time Extra
A B E wk $ Same None
B C wk $ wk $
C D G wk $ wk $
D H wk $ wk $
E F wk $ Same None
F G wk $ wk $
G H wk $ wk $
H wk $ wk $