Question: ( 1 0 points ) . 2 . An oil well is produced for 6 0 0 hrs followed by a buildup test for 5

(10 points).
2. An oil well is produced for 600 hrs followed by a buildup test for 500hrs. Sketch a typical pressure profile at the wellbore knowing that the pressure at the wellbore is affected by wellbore storage Cs1, Cs2, and ), initial reservoir pressure =7000 psi, wellbore pressure at the end of drawdown test =6200 and the average pressure at the end of the test =6950. Label all of the important features.
 (10 points). 2. An oil well is produced for 600 hrs