Question: [ 1 0 points ] Consider a production line with five workstations. table [ [ Station A ] , [ 1 worker ] ,
points Consider a production line with five workstations.
tableStation A worker minutes
tableStation B worker unitshr
tableStation C worker unitshr
tableStation D worker minutes
tableStation E workers minutes
a Which station is the bottleneck station? Note: minute means the processing time per unit
b What is the throughput rate of the system?
c What is the total processing time?