Question: [ 1 0 points ] Consider a production line with five workstations. a . Which station is the bottleneck station? ( Note: 1 0 minute

[10 points] Consider a production line with five workstations.
a. Which station is the bottleneck station? (Note: 10 minute means the processing time per unit)
b. What is the throughput rate of the system?
c. What is the tota] processing time?