Question: 1 0 Problem 2 2 - 1 2 ( Algo ) 5 Seven jobs must be processed in two operations: A and B . All

10
Problem 22-12(Algo)
5
Seven jobs must be processed in two operations: A and B. All seven jobs must go through A and B in that sequence- A first, then B.
points
Determine the optimal order (shortest flow time to complete all the jobs) in which the jobs should be sequenced through the process using these times:
\table[[Job,\table[[Process A],[Time]],\table[[Process B],[Time]],\table[[Position in],[Sequence]]],[1,9,8,],[2,7,8,],[3,9,5,7],[4,7,6,5],[5,1,2,],[6,2,3,],[7,4,5,]]