Question: 1 1 . 9 A project requiring the trenchless installation of 1 , 1 0 0 lf of 1 6 - in . steel casing
A project requiring the trenchless installation of lf of insteel casing pipe will be performed using horizontal directional drilling. Based on the selected size and type of rig, the crossing can be completed by first drilling a inpilot hole and then reaming a borehole while pulling back the pipe. The soil will be a medium stiff, low plasticity clay and the drilling fluid will be mixed to a secqt viscosity. The HDD rig is equipped with an gpm mud pump. Estimate the drilling productivity in lfhr for both the pilot bore and the final reamed hole.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock