Question: 1 2 3 4 5 6 0 . 1 2 6 1 0 . 1 2 5 9 0 . 1 2 3 9 0
Time left ::
A small manufacturer of metal ring seals for aircraft engines has been asked by its major customer to implement statistical process control SPC One major type of ring requires cutting a oneeighth inch wide slot using a milling machine. The following six samples of five observations each, taken every half hour, are width of the slots in inch made by the milling machine on the rings.
a Set up the sample mean and range control charts for this operation.
marks
b Is the process in control? marks
c The seventh sample contains the following values: and marks Using the control charts from part a is the process still in control. marks