Question: 1 4 6. A Methods and Measurements Analyst needs to develop a time standard for a certain task. The task involves use of ruler, square,

1 4 6. A Methods and Measurements Analyst needs
1 4 6. A Methods and Measurements Analyst needs to develop a time standard for a certain task. The task involves use of ruler, square, and portable electric saw to mark and cut the "notch" in a rafter (a standard carpentry task of home construction). In a preliminary study, he observed one of his workers perform this task five times. The observations were made in an air-conditioned, well-lighted training facility, at ground level, with all tools and equipment clean and readily available. Observation: 2 3 5 Task time (seconds): 82 74 80 83 76 a. What is the actual average time for this task? (5P) b. What is the normal time for this task if the employee worked at a 20% faster pace than is typical for adequately trained workers? (5P) c. What is standard time for this task if allowances are 8% constant and 6% variable? (5P) d. If the analyst then thought more carefully about his experiment, and decided that the variable allowances needed to be increased to match the real (outside, unair-conditioned) work environment, and that the proper variable allowance was not 6% but 12%, what is the revised Standard time? (5P)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!