Question: 1 5 - 1 3 7 . The bin deposits gravel onto the conveyor belt at the rate of 1 5 0 0 l b
The bin deposits gravel onto the conveyor belt at the rate of If the speed of the belt is determine how much greater the tension in the top portion of the belt must be than that in the bottom portion in order to pull the belt forward.