Question: 1 9 - 1 3 . Design a VCP gravity flow sewer main starting at the intersection of 4 th and G Streets and ending
Design a VCP gravity flow sewer main starting at the intersection of th and G
Streets and ending at the intersection of nd and B Streets Figure P Prepare
a sewer design table similar to that shown in Example and a profile drawing
similar to Figure b Use the following assumptions: minimum invert depth is
the invert of the sewer entering the main from G Street east and west is at an
elevation of Contributing flows, including from mains are given below.
Adapted from Metcalf & Eddy,
Peak hour lateral flow rates including II