Question: 1. A city is planning to develop a road system linking City 1 to City 9, depicted in the below figure (the numbers next to
1. A city is planning to develop a road system linking City 1 to City 9, depicted in the below figure (the numbers next to each arc indicate distance in miles). Two proposals are under consideration: A series of six-lane super-streets linking all 9 cities shown in the figure. Super- streets are estimated to cost $600,000 per mile to build. A ten-lane freeway extension connecting City 1 with City 9 (which does not nec- essarily pass through all nine cities.) Each mile of the freeway will cost $800,000.

-
What type of optimization problem can be used to model the first proposal? Write this formulation, including descriptions of the constraints.
-
Solve this problem using any exact method, and provide the total cost of the proposal.