Question: 1 . A site is being considered for hydropower development. 1 0 years of flow rate date, in ft 3 / s as a function

1. A site is being considered for hydropower development. 10 years of flow rate date, in ft3/s as a
function of time, are given in the file Flow Data on canvas.
a. Is it technically possible to establish a hydropower plant at this site with a constant
discharge rate of 60 m3/s? One way to visualize available flow is a discharge curve. This is
constructed by ordering discharge from highest to lowest and plotting the result against
their position in the ordered time series. When visualized this way, the x-axis is called the
exceedance(i.e., the percentage of time the flow rate is more than or equal to some
value).
b. Construct a discharge curve, in m3/s, for this site. This has implicates for the trade-off
between power rating and capacity factor. c) Assuming net head and water-to-wire
efficiency is constant, how much greater would the design power output of a hydropower
plant with a design discharge equal to 50% exceedance be than one equal to 80%
exceedance?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!