Question: 1 . A . Use the Burland - Burbidge method to estimate the expected settlement for a square foo 8 f t . by 8

1.A. Use the Burland-Burbidge method to estimate the expected settlement for a square foo 8ft. by 8ft in plan, that is at the interior of a building. Footing thickness is to be assumed to and bottom of the footing is to be set 4ft. below ground surface. This footing will have a des contact pressure of 3.5tsf. It will bear on the natural sand soil represented by test boring B(copy of log attached). You must use your assessment of soil conditions to determine the ap unit weight to use. Sand has an average N-value (made with the donut hammer) of 21 blows through the depth of concern for settlement. You will need to determine the N6O values. Groundwater is at depth indicated on the boring log: Use the time factor for 50 years. 1.B. The settlement you calculated was determined to be too much, so you have decided to and reduce the contact pressure to a lower value of 2.25tsf. For the same overall column lo footing has to be bigger in plan dimension), how much settlement is now calculated?
1.C. How much settlement would be estimated to occur for the building's planned wall footin which will be a continuous wall footing, with width of 3.0ft and contact pressure of 2.0tsf?
1 . A . Use the Burland - Burbidge method to

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!