Question: a 3 meter thick clay saturated clay layer is doubly drained. the C v = . 0 2 5 4 m 2 ? day, determine

a 3 meter thick clay saturated clay layer is doubly drained. the
Cv=.0254m2? day, determine the time, in days, to reach 90%
consolidation
a.60 days
b.75 days
c.80 days
d.85 days
e.90 days